Wind power onshore 3-6 MW, offshore 8-15 MW. Needs full-converter drives, PMSG generators, SKF large bearings and SCADA remote monitoring. Vestas (DK), Siemens Gamesa (DE) and Enercon (DE) dominate turbines; LM Wind Power and TPI lead blades.

Wind Power
Wind power onshore and offshore drives demand for MW-class converters, PMSG generators, SCADA and SKF large bearings....
Wind power onshore and offshore drives demand for MW-class converters, PMSG generators, SCADA and SKF large bearings. Vestas, Siemens Gamesa and Enercon lead.
News
FAQ
Q Onshore vs offshore?
Offshore turbines 8-15 MW (onshore 3-6 MW); C5-M marine corrosion class; 5-10x higher maintenance cost; HV submarine cable connection.
Q Main bearing specifics?
Main bearings 1.5-3 m diameter — custom SKF / FAG heavy roller series; 20+ year design life; on-site replacement expensive (onshore EUR 1M, offshore EUR 5M).
Q What is SCADA used for?
Real-time generation, vibration, temperature; predictive maintenance cuts unplanned downtime; OEM remote support; energy-trading dispatch. Siemens and ABB provide wind-specific SCADA.
Q Chinese OEMs in Europe?
Goldwind, Envision and MingYang are starting European projects — must meet IEC 61400 full certification, EU LVD, CE and grid codes (VDE-AR-N 4110).
